TheAI
Request nodes
WHOLE 8-GPU NODES · BARE METAL · ROOT ACCESS

Reserve whole B300, B200, H200 and H100 nodes.

Dedicated servers with no virtualization and no shared hosts. Written quote within 24 hours. Nothing is owed until you accept it.

Whole 8-GPU nodes delivered as one cluster. Need more? Request any number of nodes.

Choose your GPU.

Whole nodes only, no fractions, no shared hosts. The written quote confirms the delivery window and the exact node configuration.

NVIDIA B300 up to 12 nodes · Madrid

January 15, 2027 · MadridReserved · 12, 24 or 36 months
GPU
8× B300 SXM6 · 288GB HBM3e
CPU
2× Intel Xeon 6776P · 128 cores
Memory
2 TB DDR5-6400
Storage
8× 3.84 TB NVMe + 2× 960 GB boot
Network
InfiniBand
Internet
10 Gbps uplink included

Full spec and terms →

$6.40/GPU·hr
on a 12-month term

Take-or-pay, 25% at signing, can be held in escrow until the nodes are activated. Written quote within 24 hours; no payment until you accept.

Request written quote →

NVIDIA B300 up to 32 nodes · Iowa

About 12 weeks after deposit · IowaReserved · 36 or 60 months
GPU
8× B300 SXM6 · 288GB HBM3e
CPU
2× Intel Xeon 6 · 128 cores
Memory
2 TB DDR5 (3 TB available)
Storage
~30.7 TB NVMe (8× 3.84 TB)
Network
8× ConnectX-8 800G
Location
Iowa · Tier III

Full spec and terms →

$4.80/GPU·hr
on a 36-month term

Take-or-pay, 30% at signing. Written quote within 24 hours; no payment until you accept.

Request written quote →

NVIDIA B300 32 to 64+ nodes · Mexico City

End of January 2027 · Mexico CityReserved · 36 months
GPU
8× B300 SXM6 · 288GB HBM3e
Memory
4 TB DDR5
Network
InfiniBand XDR 800G · non-blocking

Full spec and terms →

$5.10/GPU·hr
on a 36-month term

Take-or-pay, 30% at signing. Written quote within 24 hours; no payment until you accept.

Request written quote →

Don't see what you need?

Minimum terms: B300 12 months, B200 36 months, H200 12 months, H100 6 months; shorter rentals are not available. Tell us the GPU, node count, term and region, and we'll answer within 48 hours.

How it works.

TheAI finds GPU capacity at data-center operators and runs the deal for you. You sign the rental agreement (MSA and order form) with the operator of your site and pay the operator; the operator pays our fee, so TheAI charges you nothing.

  1. RequestLot, nodes, term and target start. Free, no obligation.
  2. Quote in 24 hoursSite, delivery window, exact spec and rate, in writing.
  3. PaperworkKYC first, then the operator's MSA and order form. You sign directly with the operator of your site.
  4. Payment locks itPaid to the operator on the terms listed on your lot and in your quote. TheAI charges you nothing.
  5. Acceptance, then billingNCCL, DCGM and burn-in before billing starts. On typical lot terms a failed run means the prepayment is refunded; the agreement governs.

Team.

Viacheslav Zhvart — CTO, GPU infrastructure supply
Viacheslav Zhvart
CTO, GPU infrastructure supply

Leads a unit that puts datacenter GPU capacity into production. Talks to DCs, engineers, and buyers in one thread — from rack constraints to contract language.

Mykola Baichak — Head of ML Infrastructure
Mykola Baichak
Head of ML Infrastructure

Senior engineer with 10+ years building high-performance systems across autonomous driving, quantitative trading, and large-scale ML inference.

Pavel Solovskyi — ML Infrastructure & Performance Engineering
Pavel Solovskyi
ML Infrastructure & Performance Engineering

Infrastructure engineer specializing in confidential AI compute, GPU performance engineering, and large-scale inference operations.

Before you reserve.

Who do I sign with, and who pays TheAI?

TheAI finds GPU capacity at data-center operators and runs the deal for you. You sign the rental agreement (MSA and order form) with the operator of your site and pay the operator; the operator pays our fee, so TheAI charges you nothing. We don't own the hardware: we find it, quote it and handle the deal from request to acceptance.

How fast do I get access after signing?

Each lot lists its availability: some are ready now, others a set time after the deposit. The exact window is written into the operator's agreement, and on typical lot terms billing starts only after acceptance benchmarks pass.

Which terms do you offer?

Each lot lists its own terms and rates; see Pricing. The written quote confirms the delivery window and the exact node configuration. Terms shorter than the ones listed there are not available. If you need another GPU, location or size, tell us in the form and we'll answer within 48 hours.

Is the reservation paid or binding?

Requesting a configuration is free and creates no obligation, and TheAI never charges you. Your quote — site, delivery window, spec and rate — comes within 24 hours. Once you sign the operator's agreement and pay on the terms listed on the lot, your nodes and rate are secured; reserved terms are take-or-pay from that point.

How do I lock my slot and rate?

Request a configuration → written quote within 24 hours → you accept → KYC, then the operator's MSA and order form → the operator's invoice → nodes and rate secured. Reserved lots start with a prepayment (each lot lists its share), take-or-pay, with the remainder invoiced monthly; the agreement you sign governs.

Can I cancel a locked reservation?

A signed reservation is a rental contract with the operator, not a hold. On typical lot terms the prepayment is credited to your term and is not refunded if you cancel; the operator's agreement sets the exact terms, including when the prepayment is credited. Until you accept a quote, nothing is owed.

What if the delivery window slips?

On typical lot terms, if the delivery window in the agreement is missed, you choose a rate reduction for the delay or a full refund of the prepayment if the delay is material; billing does not start before acceptance, and your rate does not move. The exact remedy is in the operator's agreement you sign.

What if the cluster doesn't pass acceptance?

Acceptance criteria are written into the operator's agreement before delivery. On typical lot terms, if the cluster doesn't pass them, the prepayment is refunded in full; the agreement governs. The criteria we ask for: nccl-tests all_reduce inside the node over NVLink and across nodes over the cluster fabric, against the bandwidth thresholds named in the agreement; DCGM diagnostics at level 3; and a burn-in run.

Can I train across multiple nodes?

It depends on the lot: the network between nodes is listed on each lot. Nodes in one reservation are delivered together as a single cluster. Tell us your workload and we'll confirm the fit in the quote.

How does billing work?

You pay the operator, on the terms listed on the lot: usually a prepayment after you sign, then monthly invoices per the agreement. TheAI charges you nothing; the operator pays our fee. On typical lot terms billing starts only after acceptance benchmarks pass, and the lots we list have no egress fees.

What SLA do you offer?

Service levels are set per cluster in the operator's agreement; on typical lot terms they are backed by service credits. A lot with a fixed SLA lists it.

Who can use the service?

The hardware is of U.S. origin, so U.S. export controls apply wherever the nodes are hosted, and we follow them: every organization passes screening during quote acceptance, before workloads run.

Ready to reserve?

Written quote in 24h. No payment until you accept.

From the blogHow Much Blackwell Actually Exists?Blackwell shipments set records every quarter — and the median public B300 on-demand price rose 57% since November. We reconstruct how much has actually shipped (~7M packages), how little of it is rentable (two sub-12-month listings), and why prices rise while supply booms.All articles →