TheAI·cloud
RESERVED CAPACITY · WHOLE 8-GPU NODES · 1 TO 24 MONTHS

Reserve whole B300 and B200 nodes.

B300 from October 15, 2026 in Canada, from $6.05/GPU·hr on a 1-year term, ~21% under Verda's published annual rate. B200 December 2026 in the United States, from $4.85. Written quote within 24 hours. Nothing is owed until you accept it.

One cluster: 8 nodes · 64× B300 on a single fabric. Need more? Request any number of nodes.

Two lots.

Whole nodes only, no fractions, no shared hosts. Pick the lot, the term and the node count; the written quote names the site and the delivery window.

NVIDIA B300 whole 8-GPU node

from October 15, 2026 · CanadaReserved · 1–24 months
GPU
8× B300 SXM6 · 288GB HBM3e
CPU
2× server-class CPUs
Memory
DDR5 · named in quote
Storage
Local NVMe · named in quote
Network
NVLink 5 · fabric named in quote
Location
Canada · US · Tier III

First nodes ship from October 15, 2026 in Canada; larger blocks from December 2026 in the United States. Acceptance benchmarks before billing starts; SLA with service credits per agreement. B300 product page →

from$6.05/GPU·hr
on a 1 year term
Nodes
= 8× B300 SXM6 · 288GB
Term
≈ PER MONTH$35,332 · 1 node
TERM TOTAL$423,984 take-or-pay
30% AT SIGNING$127,195 only after you accept the quote

Site, delivery window and exact spec come in writing within 24 hours. No payment until you accept. KYC, MSA and order form follow the quote.

NVIDIA B200 whole 8-GPU node

December 2026 · United StatesReserved · 1–24 months
GPU
8× B200 180GB SXM · 180GB HBM3e
CPU
2× server-class CPUs
Memory
~2 TB DDR5
Storage
~31 TB NVMe per node
Network
NDR InfiniBand · NVLink 5
Location
United States · Tier III

Up to 32 nodes / 256 GPUs in one NDR InfiniBand fabric, direct liquid cooling. Same acceptance benchmarks; SLA with credits per agreement. B200 product page →

from$4.85/GPU·hr
on a 1 year term
Nodes
= 8× B200 180GB SXM
Term
≈ PER MONTH$28,324 · 1 node
TERM TOTAL$339,888 take-or-pay
30% AT SIGNING$101,966 only after you accept the quote

Site, delivery window and exact spec come in writing within 24 hours. No payment until you accept. KYC, MSA and order form follow the quote.

How it works.

  1. RequestLot, nodes, term, target start. Free, no obligation.
  2. Quote in 24 hoursSite, delivery window, exact spec and rate, in writing.
  3. PaperworkKYC first, then MSA and order form. Standard documents, no surprises.
  4. 30% locks itA 30% invoice locks slot and rate. Take-or-pay.
  5. Acceptance, then billingNCCL, DCGM and burn-in before billing starts. Fail them, and the prepayment is refunded.

Team.

Oleksiy Sitnichenko — CEO
Oleksiy Sitnichenko
CEO

Over 20 years of global executive leadership: business management, entrepreneurship, and strategic development across diverse international markets.

Viacheslav Zhvart — CTO, GPU infrastructure supply
Viacheslav Zhvart
CTO, GPU infrastructure supply

Leads a unit that puts datacenter GPU capacity into production. Talks to DCs, engineers, and buyers in one thread — from rack constraints to contract language.

Mykola Baichak — Head of ML Infrastructure
Mykola Baichak
Head of ML Infrastructure

Senior engineer with 10+ years building high-performance systems across autonomous driving, quantitative trading, and large-scale ML inference.

Pavel Solovskyi — ML Infrastructure & Performance Engineering
Pavel Solovskyi
ML Infrastructure & Performance Engineering

Infrastructure engineer specializing in confidential AI compute, GPU performance engineering, and large-scale inference operations.

Before you reserve.

How fast do I get access after signing?

The delivery window is written into your capacity agreement — up to two months from signing, typically within a month. Tell us your target date in the request; earlier allocations open up regularly, and we'll say plainly what's possible. Billing starts only after acceptance benchmarks pass.

Is the reservation paid or binding?

Requesting a configuration is free and creates no obligation. Your quote — site, delivery window, spec and rate — comes within 24 hours. A 30% prepayment then locks your slot and rate; from that point the reservation is take-or-pay.

How do I lock my slot and rate?

Request a configuration → written quote within 24 hours → you accept → KYC, then MSA and order form → 30% prepayment invoice → slot and rate locked, take-or-pay. Remaining 70% per the agreement, monthly invoicing is standard.

Can I cancel a locked reservation?

A locked reservation is a rental contract, not a hold: the 30% prepayment is credited to your term and is not refunded if you cancel. Until you accept a quote, nothing is owed.

What if the delivery window slips?

If the delivery window in your agreement is missed, you choose: a rate reduction for the delay, or a full refund of the prepayment if the delay is material. Billing never starts before acceptance, and your rate does not move.

What if the cluster doesn't pass acceptance?

Acceptance criteria are written into your agreement before delivery. If the cluster doesn't pass them, the prepayment is refunded in full. The criteria are spec-based until first delivery: nccl-tests all_reduce inside the node over NVLink and across nodes over the cluster fabric, against the bandwidth thresholds named in the agreement; DCGM diagnostics at level 3; and a burn-in run.

Can I train across multiple nodes?

Yes. Nodes in one reservation are delivered together as a single cluster on a high-bandwidth fabric; the fabric type and per-GPU bandwidth are named in your written quote for that batch. Reserve two or more and multi-node training works from day one.

How does billing work?

Reserved terms: a 30% prepayment invoice after you accept the quote, then monthly invoices per the capacity agreement. Billing starts only after acceptance benchmarks pass. No egress fees.

What SLA do you offer?

Service levels are set per cluster in the capacity agreement and backed by service credits for shortfalls. They differ between batches, but every batch carries a production-grade uptime commitment — see Terms for the credit mechanics.

Who can use the service?

Our nodes are hosted in Canada and the United States; the hardware is of U.S. origin, so U.S. export controls apply and we follow them: every organization passes screening during quote acceptance, before workloads run.

Ready to reserve?

Written quote in 24h. No payment until you accept.

From the blogHow Much Blackwell Actually Exists?Blackwell shipments set records every quarter — and the median public B300 on-demand price rose 57% since November. We reconstruct how much has actually shipped (~7M packages), how little of it is rentable (two sub-12-month listings), and why prices rise while supply booms.All articles →